FCFC LONGDE SITE
Existing buildings · Power availability under review
The owner corrected this lead to 70 MW. It concerns existing buildings at FCFC Longde, with power still under review. Existing factory supply or captive generation does not establish AIDC approval, energization or rentable capacity. News supports asset-reuse background, not approval of 70 MW. Do not merge this record with other FCFC sites, Lize compute projects or on-site generating facilities.