Miaoli AI Data Center Projects

Explore published and rumored compute projects, location precision, capacity definitions and original sources.

Catalog coverage: 4 records. This is not an exhaustive national inventory or an operational-capacity total.

TONGXIAO AICC DEVELOPMENT

Power application · Owner update

100 MW is a two-phase supply plan: 30 MW planned for 2029-06-20, followed by an additional 70 MW on 2030-02-20. The owner’s latest update places the project at the power-application stage. The supplied 2026-07-31 Taipower letter includes validity, works, inspection and contract conditions; it is not proof of 100 MW currently available. Backup capacity must not be added to regular supply. Planned wind, solar, storage and gas facilities in the applicant’s concept are not verified assets or an achieved RE100 commitment.

MEDIATEK TONGLUO R&D DATA CENTER

Partly operational · Phase 1 opened

MediaTek announced the opening of Phase 1 on 2026-05-07. News reports cite 15 MW for Phase 1 and 45 MW across three phases. The 45 MW plan includes Phase 1: do not add them or describe all 45 MW as operational. This is an internal R&D facility; external rental availability is unconfirmed.

PHISON ZHUNAN DATA CENTER PLAN

Power application · Owner update

Public acquisition records more strongly support the former Taiwan Imperial Tobacco facility at No. 8, Qunyi Road, Zhunan. The owner reports a power application; MW is undisclosed. A 2026-05-08 filing republication lists an NT$2.05 billion property transaction, and a 2026-09-11 report links the site to an AI data center plan. A separate 2026-09-09 report names Taiwan Tobacco and Liquor and NT$1.65 billion; these conflicting descriptions must not be merged. Existing Phison AI servers elsewhere are not equipment at this planned site.

CPDC TOUFEN AI COMPUTE CENTER PLAN

Collaboration planning · Stage unconfirmed

CPDC plans to reuse its Toufen plant for AI compute. The 2026-09-17 MoneyDJ report gives 5 MW for Phase 1 and a 50–100 MW Phase 2 plan; Phase 3 scale is undisclosed. These are plans, not energized or rentable inventory. Collaboration is still being developed. Reported customer demand does not establish named buyers, signed contracts, equipment counts or opening dates. Existing feeders, generation and cooling do not prove power approval for the AIDC.