Tainan AI Data Center Projects

Explore published and rumored compute projects, location precision, capacity definitions and original sources.

Catalog coverage: 2 records. This is not an exhaustive national inventory or an operational-capacity total.

WISTRON GUIREN COMPUTING CENTER

Power application · Owner update

The main card uses a 10 MW plan consistently reported by multiple sources on 2026-07-30 and in subsequent August coverage. A 2026-07-31 Economic Daily report separately cites 100 MW; no company document has resolved that discrepancy, so it is not labeled a confirmed typo. The owner reports a power application. Two-stage power delivery does not mean either or both stages are energized; stage-level MW and exact dates are undisclosed.

SIGNALPRO XINSHI AI FACTORY

Power application · Owner-reported

The project scale is 6 MW, with approximately 1 MW of cooperation with GMI Cloud, according to information supplied to the platform. These figures have different scopes and must not be added together. The partnership is public; reporting describes 72 HGX B300 systems, without confirming their full allocation to this factory or commissioning.