TATUNG DAYUAN AI DATA CENTER PLAN
Planning / POC preparation · Stage unconfirmed
Public reports link Tatung’s Taoyuan AI data center planning to its Dayuan factory and mention collaboration discussions and POC preparation. Capacity, power application, construction, energization and rental inventory are undisclosed. Reports dated 2025-11-10 and 2026-09-14 provide planning context. A factory registry status of operating concerns the existing factory, not the proposed AI data center.
Reveal on the mapCapacity & definitions
未公開 · 未公開 MW、IT 負載、GPU 數量或可出租庫存
Total power and IT load are different measures: do not add them. Published plans do not establish energized capacity, commercial operation or rental availability.
Public location
No. 102, Minsheng Road, Neihai Village, Dayuan, Taoyuan, Taiwan
Approximate public address for Tatung’s Dayuan factory. The AI data center building, entrance and works footprint are not verified.
Companies & roles (source language)
大同股份有限公司/Tatung — 大園廠土地、重電與集團整合能力相關方;公開合作條件與最終營運模式尚未揭露
Evidence, phases & discrepancies (source language)
公開報導為合作洽談及 POC 準備;未確認用電申請、開工、送電或營運
公開資料未揭露用電申請、核准或送電狀態;不得由鄰近電廠或既有工廠推定。
合作與基地規劃 · 大同確認有國內外科技業者洽談;合作方、投資額與契約未公開 · 2025-11-10 · 洽談不等於簽約、用電核准或工程開工。
AI DC POC · 2026-09-14 報導稱設備製造中、預計安裝 POC;未取得完成或投運證據 · 2026-09-14 · POC 是概念驗證,不自動視為資料中心已建置或可出租。
2025-11-10 報導把規劃基地指向大同大園廠,並稱有數家國內外科技業者洽談。
2026-09-14 報導提到桃園自有 AI DC、設備製造及 POC 安裝規劃,但未公布容量、確切棟別或供電程序。
大世科、精英、大同電力事業群及大同智能是報導列出的集團能力,不因此推定全部都是此案投資人或股東。
工廠登記的『生產中』是既有工廠狀態,不是 AI 資料中心營運狀態。
鄰近大型電源或既有工廠用電不等於 AIDC 已取得可用容量。
Original sources
- 經濟日報:大同、華碩擬建置桃園 AI 算力中心
Source date:2026-09-14 · Checked:2026-09-18
規劃與 POC 不等於已開工、已核電或已營運。
- 經濟日報:大同大園廠 AI 資料中心合作洽談
Source date:2025-11-10 · Checked:2026-09-18
洽談不等於簽約或工程許可。
- 經濟部工廠登記:大同股份有限公司大園廠
Source date:— · Checked:2026-09-18
僅支持廠區門牌與既有工廠背景。
- 公開地址資料:大園區民生路 102 號
Source date:— · Checked:2026-09-18
座標只作公開門牌約略定位。
Record checked:2026-09-18
Translation does not constitute a new verification.