FENGCHI SHENGANG AIDC
Power application submitted
Provider-reported 9.9 MW project in Shengang, Taichung. A Taipower application has been submitted; approval has not been verified. Received on 2026-10-08; not independently verified. Total power and IT load are not separately disclosed.
Reveal on the mapCapacity & definitions
9.9 MW · 提供者申報容量;非核准供電或可租庫存
Total power and IT load are different measures: do not add them. Published plans do not establish energized capacity, commercial operation or rental availability.
Public location
Shengang District, Taichung, Taiwan; street address not provided
District-level illustrative anchor only, not the facility location or entrance. Exact site remains unverified.
Companies & roles (source language)
風馳電能 — 開發方
Evidence, phases & discrepancies (source language)
已向台電提出用電申請;尚未提供供電核准文件。
已向台電提出用電申請;尚未提供供電核准文件。
目前進度 · 已向台電提出申請 · 2026-10-08 · 已向台電提出用電申請;尚未提供供電核准文件。
未提供可核對的公開報導或文件;資訊接收日不代表獨立查核完成。
Original sources
- 提供者補充(2026-10-08)
Source date:2026-10-08 · Checked:—
已向台電提出用電申請;尚未提供供電核准文件。 尚未獨立查證。
Record checked:—
Translation does not constitute a new verification.