AIDC / COMPUTE INTELLIGENCE
GUISHAN AI DATA CENTER
Public development intelligence
A publicly announced collaboration involving Taiwan Mobile, GMI Cloud and Vantage. Announced scale: approximately 7,000 NVIDIA Blackwell Ultra GPUs on GB300 NVL72, across 96 racks. Total power capacity is 25 MW; IT load is 16 MW. These figures are different measures and must not be added. Announced equipment is not live rental inventory or proof that all GPUs are operational.
Reveal on the mapCapacity & definitions
- Total power capacity
- 25 MW
- IT load
- 16 MW
- Announced GPU count
- 7000 GPU
- Announced racks
- 96
Total power and IT load are different measures: do not add them. Published plans do not establish energized capacity, commercial operation or rental availability.
Public location
No. 109, Baoshi Street, Guishan District, Taoyuan, Taiwan
Approximate Vantage TPE1 campus location from a public directory, not survey coordinates. GMI’s building, floor and data hall entrance have not been verified.
Companies & roles (source language)
Taiwan Mobile — 機房維運、電信網路與企業服務
GMI Cloud — GPU 雲算力、算力調度與服務合作
Vantage Data Centers — 園區開發與資料中心基礎設施
Evidence, phases & discrepancies (source language)
Original sources
- 位置名錄 · Data Center Map
Source date:— · Checked:2026-09-13
- 台灣大 · 容量與 Vantage 合作
Source date:2025-10-23 · Checked:2026-09-13
- 台灣大 · GPU 公布規模
Source date:2026-06-02 · Checked:2026-09-13
- GMI · AI Factory 公告
Source date:2025-11-17 · Checked:2026-09-13
- 台灣大 · 維運與算力調度分工
Source date:2026-06-04 · Checked:2026-09-13
Record checked:2026-09-13
Translation does not constitute a new verification.
Evidence methodology