SB Energy / OpenAI Milam Campus

Under construction

The current developer page lists construction and approximately 750 MW; January 2026 reporting cites 1.2 GW. Scope/basis reconciliation is pending; do not add the figures or treat them as rental inventory.

Reveal on the map

Capacity & definitions

750 MW · 公開設施/規劃規模,非可出租庫存

Total power and IT load are different measures: do not add them. Published plans do not establish energized capacity, commercial operation or rental availability.

Public location

Texas · Milam County

Illustrative city, county or campus-area anchor from the publicly named locality, not surveyed premises, an entrance or a parcel. A listed public address does not make this marker an exact geocode.

Companies & roles (source language)

SB Energy — 公開來源所列參與公司;職責以原文為準

OpenAI — 公開來源所列參與公司;職責以原文為準

SoftBank — 公開來源所列參與公司;職責以原文為準

Evidence, phases & discrepancies (source language)

開發商現行頁列施工中、約750MW;2026年1月新聞另載1.2GW。範圍與容量口徑待交叉確認,兩數不可相加或當作出租庫存。

來源日期所載進度 · 建置中 · 開發商現行頁列施工中、約750MW;2026年1月新聞另載1.2GW。範圍與容量口徑待交叉確認,兩數不可相加或當作出租庫存。

開發商現行頁列施工中、約750MW;2026年1月新聞另載1.2GW。範圍與容量口徑待交叉確認,兩數不可相加或當作出租庫存。

Original sources

  1. SB Energy · 日期未標示

    Source date:— · Checked:2026-10-09

  2. Reuters · 2026-01-09

    Source date:2026-01-09 · Checked:2026-10-09

Record checked:2026-10-09

Translation does not constitute a new verification.

Evidence methodology