AIDC / COMPUTE INTELLIGENCE
Hut 8 River Bend
Under construction
Developer lists 245 MW contracted IT capacity supported by 330 MW utility capacity. Commercialization is not delivery; full commissioning is not verified from this page. An October 7 report confirms construction.
Reveal on the mapCapacity & definitions
245 MW · 公開設施/規劃規模,非可出租庫存
Total power and IT load are different measures: do not add them. Published plans do not establish energized capacity, commercial operation or rental availability.
Public location
Louisiana · St. Francisville, West Feliciana
Illustrative city, county or campus-area anchor from the publicly named locality, not surveyed premises, an entrance or a parcel. A listed public address does not make this marker an exact geocode.
Companies & roles (source language)
Hut 8 — 公開來源所列參與公司;職責以原文為準
Anthropic — 公開來源所列參與公司;職責以原文為準
Fluidstack — 公開來源所列參與公司;職責以原文為準
Evidence, phases & discrepancies (source language)
官方專案頁列245MW IT已簽約、330MW公用電力容量;簽約不等於交付,未由此頁確認完整投運。 2026年10月7日報導指已在興建。
來源日期所載進度 · 規劃中 · 官方專案頁列245MW IT已簽約、330MW公用電力容量;簽約不等於交付,未由此頁確認完整投運。
公開動工進度 · 建置中 · 2026-10-07 · 2026年10月7日報導指已在興建。
Original sources
- Hut 8 · 日期未標示
Source date:— · Checked:2026-10-09
- Axios · 2026-10-07
Source date:2026-10-07 · Checked:2026-10-09
Record checked:2026-10-09
Translation does not constitute a new verification.
Evidence methodology